Alex's Bar Project

Back to home | Phase 1: The Bar | Phase 1.5: Temporary shelf
Phase 2: Bulkhead w/ stemware rack | Phase 3: Backbar base | Phase 4: Cabinets & mirror

Our bar, which we call "Tigh Pegeen", is almost complete. The bar-opening party was a success, and the band was great! Check out The Flea Bitten Dirt Band's Web site to hear their sounds and see some photos from the party.

The only things left now are the plumbing, and a couple more pieces of crown moulding across the top.

Once the credit-card debt from the building of the bar has been paid off, the next part of the plan is to install a flat-panel monitor and linux PC, tapped into my wireless network, to keep drink recipes.

The construction of the bar has been documented, from the very first step to the last. Check out the step-by-step progess of the bar below:

Phase 1: The bar Phase 1.5: Temporary shelf Phase 2: Bulkhead & stemware rack w/ light
The flooring Phase 3: The backbar Phase 4: The backbar cabinets, shelf and mirror
Phase 5: The Celebration
Photos of The Flea Bitten Dirt Band's debut performance at the bar-warming party!

 

© 2006-7 Alex Russell. This site is a product of Russell dZine.
Hosted by High Speed Rails, Inc. Powered by ZOPE.
Other Russell dZine sites: PhotosByAlex.net | Flea Bitten Dirt Band | Wine Tasting Database